Service in Power Sector
IMPORTANT : Please read these instructions carefully
This page is intended for user registered in either group (Friend or Relative or Rtpian). If not registered- user can view very limited or even no content. Friends or Colleagues / Relatives / Rtpians are requested to please register for viewing the full content in this page
Transmission Corporation of Telangana Limited (TSTransco) (2-6-2014-31-10-2018)
Please register to view the full content.
Proceeded on HPL (Half Pay Leave Commuted to Full Pay) on Medical Grounds
Applied for Half Pay Leave commuted to Full Pay on Medical Grounds to be effect from 22-8-2015 and Proceeded on Leave.
Transfer To Vidyut Soudha (From Adilabad)
I was given Transfer Orers to Vidyut Soudha and was directed to work as GM/IT/VS (additionally as Project Manager to SAP ERP Project) accordingly.
Assumed charge as GM-IT/VS on 3-11-2015
The General Manager (GM) /IT post was newly formed (by converting the post of SE/TLC/Nalgonda which existed before bi-furcation of the State) in order to look after the IT related activities and in addition, to manage the then newly upcoming SAP ERP project as Project Manager.
Implementation of ERP WHEEL Project
The new SAP ERP Project (named as WHEEL - Wisdom to Harness Energy Efficiency Landscape) has commenced with Kick-off meeting held on 21-1-2016. It was successfully completed with a record time of 8-months and the Project gone Live with effect from 3rd September, 2016
Promotion to the cadre of Chief Engineer (Ele.)
In the month of May 2017 promotion Orders were given from the cadre of Superintending Engineer (General Manager-IT) to next higher cadre i.e. Chief Engineer/Elec. after completing 1 year 6 months as GM-IT.
Assumption of Charge as Chief Engineer/Transmission
Assumed charge as Chief Engineer/Transmission on 8-5-2017 where-in Monitor all the Construction and O&M works pertaining to 132 /220 KV Lines and Substations of TSTRANSCO's Transmission Network including setting up of Solar Power Units apart from O&M works of 400 KV Network. Looked after works duly co-ordinating between the zonal units and the top management with respect to O&M and Construction works.
Assumption of Charge as Chief Engineer/IT&QC
In the month of June 2017, consequent to creation of new post i.e. CE/IT & QC (along with many other posts within TSTransco), Transfer Orders were issued from the post of CE/Transmission to the post of CE/IT&QC.
Assumed charge as Chief Engineer/IT & Quality Control on 12-6-2017 to look after all the IT related activities (including SAP ERP) apart from the Quality Control wing.